Worldline

We installed 154 charging points in the parking lot, supported by 9 sidewalk cabinets. To power this, we expanded both the high- and low-voltage systems. Future-ready? Absolutely. We also placed conduits for upcoming CCTV upgrades and added cabling to prepare for new lighting.

charging stations - high-voltage - smart charging

Discover more

A turn-key solar panel project in which we installed 900 panels. We managed the entire project, including adjustments to the existing electrical installation. 

Button

Arval

Button

Button

This project was realized in partnership with the client. Throughout this project, we installed 95 charging points and 4 new distribution boards. Additionally, we expanded the electrical installation to accommodate these additions.

Arval

We were proud to carry out this all-in-one project from start to finish. We installed 27 new charging points and took over the operation of 3 existing ones in the parking area. To support this, we designed and installed a new distribution board and expanded the electrical setup. A seamless solution, delivered by one trusted partner.

charging stations - smart charging - branding

Discover more

Dok Noord

A full-scope project, all handled by one team. We installed 27 new charging points and took over 3 existing ones. On top of that, we designed and installed a new distribution board, expanding the electrical installation to support future needs,  efficient, streamlined, and built to last.

charging stations

Discover more

DC chargers

We installed and commissioned DC fast chargers across three sites. Each location was equipped with local lighting and fitted with an emergency stop connected to the high-voltage cabin — ensuring both speed and safety for every charging session.

Fast charging - lighting 

Discover more


Kortenberg

A unique, tailor-made project by AAtechnics: we installed 20 charging stations, 1.25 MWp of solar panels, and a 600 kWh battery container. To top it off, we developed our own EMS system — C-all — to monitor and manage the entire setup with maximum efficiency.

solar installation - battery storage - monitoring

Discover more

Colab Powerbee

Together with Powerbee, we helped e5 mode take a major step in their sustainability strategy. We installed solar panels and a battery system, leading to an estimated annual CO₂ reduction of 120,000 kg. A great example of teamwork powering greener goals!

Battery storage - solar installation

Discover more

Godshuis

At the Godshuis, we carried out a full upgrade of the electrical and lighting systems. Our team renewed the entire installation and implemented a lighting concept for the whole site. This all-in-one approach improved efficiency, functionality, and atmosphere—bringing new life to a unique location.

electrical project

Discover more




Circularium

We delivered a turn-key solar panel project with 900 panels, fully managed from start to finish. Our team also made the necessary adjustments to the existing electrical setup. A smooth, all-in-one solution that supports green energy and long-term savings.

solar installation

Discover more


Otterburcht

At Otterburcht, innovation meets sustainability. We delivered a full-scope project including 70 kWp solar panels, 12 smart charging stations, and a complete electrical setup with data, lighting, access control, fire safety, and energy monitoring — all managed by one expert team from start to finish.

solar installation - charging stations - electrical project - security - integrated energy solutions

Discover more

Parking 21

In Parking 21, we installed 59 wall-mounted AC charging stations with smart MINT integration and a robust data network. We also set up a CPO platform for easy and reliable management. A future-proof solution that makes EV charging simpler and greener, all thanks to great teamwork and sustainable ambition!

charging stations - smart charging

Discover more

Gandae

We are handling the full electrical setup. From power distribution and lighting to charging stations, fire detection, and access control—both for the warehouse and offices. We’re now working on the office installation, following the successful delivery of the production area. Battery storage is also added in partnership with Powerbee.

integrated energy solutions - electrical project - security - battery storage

Discover more

Dok Noord - Fase 2

We installed 13 double charging stations on level -3 of an underground parking garage, all neatly wall-mounted. To ensure smart and efficient charging, we implemented load balancing via the MInt system. A new data rack and electrical panel were added, adapting the existing setup to support the new charging infrastructure.

charging stations - smart charging